Improving productivity in construction, Built Environment Matters podcast with Josh Johnson, Expert - Engineering Construction & Building Materials at McKinsey & Company. Part 1 of 2.
Clearly, no prison design concept will inherently rehabilitate people.
Typically, these large structures are put up overnight by a small team of trained operatives.In a budget-conscious industry, every hour counts, so assembly is planned to be as quick as possible, and disassembly is just as quick.
It would be even quicker if the tent was pre-erected, of course, but this doesn’t make sense from a transportation and logistics perspective.Instead, they use a component kit-of-parts that is easily handled and takes up very little space during transportation.A permanent building may have different drivers, but lessons can still be learned from highly efficient on-site works such as the circus tent.. One aim of a fully considered DfMA strategy is to enable smooth running of the construction site.
To create a well-orchestrated assembly line with productive workers carrying out pre-determined, standardised and well-understood tasks in predictable timeframes..In short, we want construction sites to be more like factories.. Off-site and modular construction: are factories really all that great?.
Prefabrication in factories (off-site construction) is often thought of as a panacea, a sure-fire way for construction sites to achieve greater productivity.
However, factories can also be run inefficiently, and if traditional construction methods are simply shifted into a factory setting, the benefits of MMC can be diluted or lost..Generating and maintaining an up-to-date client laboratory equipment list with all requirements is a lifeline for any laboratory designer, as it becomes the gospel for all aspects of the laboratory design.
Many of the causes of delays and cost overrun with laboratory design come from not having a comprehensive laboratory equipment list stating the services requirements and specialist requirements.Frequent reviews with the client, including confirmation that the current information is still correct, can go a long way in reducing risk in the laboratory design..
It is often the case that the laboratory equipment list is updated and changed well into the design stages, with many meetings and complicated reasoning behind changes.Keeping a detailed action and decision log is very important, therefore.